Place of Origin: | Liaoning ,Shenyang |
Brand Name: | SYTOP |
Certification: | ISSO9001 |
Model Number: | TP007 |
Minimum Order Quantity: | 4pcs |
---|---|
Price: | USD 3-60/PC |
Packaging Details: | foam sheet inside and outside with wooden case or carton |
Delivery Time: | 15-30 working days |
Payment Terms: | L/C, T/T, Western Union, MoneyGram |
Supply Ability: | 20000PCS /MONTH |
Material: | Cobalt Chrome Alloy | Harness: | 38-55HRC |
---|---|---|---|
Color: | Silver And Grey | Process: | Powder Metallurgy And Casting |
Size: | Dia 8 --500mm | OEM: | Accept |
Application: | Valve Pump Parts And Sealing | Drawing Made: | Available |
High Light: | valve guide bushing,flanged sleeve bushing |
What is the Details of our Cobalt Chrome Alloy seal ring ?
Material : | Cobalt Chrome Alloy |
Process : | Powder Metallurgy , it is short for PM and investment casting |
Hardness: | 38-55 HRC |
Density : | 8.4 g/cm ³ |
Size : |
Diameter 8-500mm
|
Properties : | Wear and corrosion resistance, high temperature resistance |
Application : | as a seal ring |
Instructions : | Drawing made upon cutomers request |
Usage : | sealing parts |
Tolerance control : | turning or grinding surface , tolerance upon drawing |
Production lead time | Samples 10 days , normal order 15-30 days |
Production capacity : | 20,000pcs one month. |
Package : | carton or wooden case , pallet for export |
Cobalt Chrome Alloy Chemical compositions and properties (%)
Brand | C | Mn | Si | Cr | Ni | Mo | W | Co | Fe | P | S |
Density (g/cm3) |
Hardness (HRC) |
ST 3 | 2.0-2.7 | 1.0 | 1.0 | 29-33 | 3.0 | 11-14 | Bal. | 3.0 | ≤0.03 | ≤0.03 | 8.55 | 51-55 | |
ST 6 | 0.9-1.4 | 1.0 | 1.5 | 27-31 | 3.0 | 1.5 | 3.5-5.5 | Bal. | 3.0 | ≤0.03 | ≤0.03 | 8.35 | 38-44 |
ST 12 | 1.1-1.7 | 1.0 | 1.0 | 28-32 | 3.0 | 7.0-9.5 | Bal. | 3.0 | ≤0.03 | ≤0.03 | 8.40 | 44-49 | |
ST 20 | 2.2-3.0 | 2.0 | 30-34 | 3.0 | 1.0 | 14-18 | Bal. | 3.0 | ≤0.05 | ≤0.05 | 8.65 | 53-59 | |
TanTung G 25 | 2.2-2.8 | 1-3 | 27-32 | 7 | Ta/Nb | 14-19 | Bal. | 2-5 | 8.84 | 57-60 | |||
TanTung G 35 | 3.3-3.8 | 1-3 | 27-32 | 7 | Ta/Nb | 14-19 | Bal. | 2-5 | 8.80 | 60-63 | |||
Triballoy 400 | 0.04 | 2.5-2.7 | 8-10 | 27-29 | Bal. | 55 | |||||||
Triballoy 800 | 0.04 | 3.2-3.6 | 16-18 | 27-29 | Bal. |
58 |
Production process of our valve seat ring
Application :
According to supplied drawing and metal compositions, many kinds of parts can be made by investment casting and powder metallurgy methods, such as valve seat insert, forging mould, valve cage and Cobalt Chrome Alloy series 3, 4, 6, 12, 21, 23, 25, 27, 30, 31, 36, as well as Co# 400, Umco 50s cobalt based alloy products.
Typical Applications :valve seat inserts ,valve seat rings ,valve cage,bearings,cutter edge,still mill guide roll,engine valve ,high temperature and pressure valve and turbine blade ,saw teeth,screw flight,sleeve,wear plate ,and variety wear parts.
Product detail
Product activity :
FAQ
Q1: What is the Warranty for our products ?
A1: We own high precision grading machine to control geometry dimensions and apply ultra fine grain size substrate coated with high performance coatings to guarantee the lifetime of our products, which can satisfy every working condition.If any quality problems on our side occurred in this period , we will take on the shipping cost and replacement.
Q2: Do you provide free samples?
A2: Yes, usually we provide free samples for testing under the condition of freight paid by customer.
Q3: What is your minimum order requirement?
A3: We will indicate the MOQ for each item in the quotation sheet. We accept the sample and trial order. If the quantity of single item can't reach the MOQ, the price should be sample price.
Q4: What is the delivery time of your products?
A4: It depends on the inventory availability.If items needed are in stock, the delivery time would be within 8 work days, but if not the delivery time would be around 20 work days.
Q5: Can you manufacture Special-shaped products?
A5: Yes, we can. We can produce both standard and special prosucts. We can make them according to your drawings and samples.
Q6: May I have my order working schedule ?
A6: Yes, we will send working schedule of your order each week. We will inspect and test all merchandise in case of damaging and missing parts before shipment. The detailed inspection pictures of the order will be sent to you for your confirmation before delivery.
Send your inquiry for more detail right now .
Contact Person: Bella Hu(Email to us, TM can't be received)
Tel: 86--13897908592
Cobalt Chrome Alloy Sleeve Powder Metallurgy And Casting Process Manufacture
Precision Machining Cobalt Alloy 6 Seat Ring Upon Drawing 38 - 48 HRC Hardness
Steel Liquid Cobalt Alloy 6 Welding Rod Tube / Salt Bath Temperature Measurement
High precision Cobalt Base Alloy 6 , Cobalt Chrome Alloy Cylinder Bushing
Gas Equipment Parts Cobalt Chrome Alloy , Cobalt Chromium Molybdenum Alloy
Spare Parts Chrome Cobalt Alloy 38HRC - 55HRC Hardness
Cobalt Tungsten Chromium Alloy Plate / Bars , Surface Finish Cast Cobalt Alloys
Corrosion Resistance Cobalt Chrome Alloy Metal Bushing Powder Metallurgy Process
High Fusion Welding Resistance Tungsten Silver Alloy Powder Pressing Processing
Customized Silver Tungsten Alloy , Silver Tungsten Contacts / Electrodes
Bright Surface AgW Silver Tungsten Alloy Electrrode Contacts High Conductivity
High Durability Silver Tungsten Alloy Round Bar / Welding Rod High Temperature Resistance